7 Questions to Ask Before Buying Automated Lab Equipment

|
Last Updated: Nov 26, 2026

Selecting the automation instrument to purchase can be a daunting task, especially with the number of available options. You should start by defining clear goals for your automation project. After determining if an instrument meets your goals, you will also need to identify if the provider will be a partner you can rely on for service, maintenance, updates, and initial programming. Almost nothing about that hour tells you what the system will do in your lab on a wet Thursday in February.

Here are seven of those questions that are worth writing down before the first quote arrives.

1. Start With the Workflow You Actually Run

Requirement: invite comparison, and comparison feels like progress. Yet the useful starting point is a map of what your team does now: examine volumes by week, the steps that create the overdue, the tasks that eat analyst hours without producing insight. Write that down before you look at a single booklet.

Labs that skip this step often automate the visible task rather than the limiting one. Pipetting looks tedious, so it gets automated, and then the congestion turns out to be sample cataloging or data review. The workflow map tells you which problem you are essentially buying a solution for.

2. Compatibility With the Instruments You Already Own

Few labs buy industrialization into an empty room. New lab automation equipment has to speak to the readers, cyclers, and storage systems previously in use, and physical fit matters as much as digital fit: deck layout, labware footprint, plate height tolerance, mount reach.

Ask for a list of confirmed labware and a list of instruments the vendor has already combined, with names you can call. Peer experience is worth real money here, and professional societies such as the Society for Laboratory Automation and Screening exist partly so that buyers can contrast notes before signing.

3. Throughput Needs an Honest Number

Vendors quote peak output. Labs live on average throughput, which is lower once you include setup, knock down, calibration, failed runs, and the gap while a reviewer walks over to reload tips. Ask for cycle times measured on a protocol like yours, with the hands-on steps included.

Then ask what happens at twice the volume. If the answer involves a second system, you want to know that while the purchase is still conceptual.

4. Scalability Past the First Assay

A system sized to today’s card ages fast. The better question is how the platform handles change: new assays, new laboratory, new reagents, a rearranged deck. Modular hardware and an open scheduling layer buy you years of applicability that a sealed, single-purpose box cannot.

Watch configuration limits too. If adding a step needs a vendor engineer and a service visit, method progress slows to the speed of someone else’s calendar.

5. Integration With Software and Data Systems

Automation produces data, and data has to land somewhere verifiable. Ask how the system attaches to your information management software, what formats it exports, whether results carry a sample indicator, and how the audit trail behaves when a run fails partially.

For regulated environments, the supplier’s own verification is part of the deliverable. The ISPE GAMP 5 framework inspires regulated companies to maximize supplier engagement and reuse supplier knowledge and verification wherever possible, which means a supplier who hands you thorough specification and testing records saves you months of confirmation work.

6. Maintenance, Uptime, and Who Answers the Phone

Every automated system fails ultimately, and the gap between a four-hour response and a four-day response is the gap between a late report and a missed study. Ask about preventative maintenance intervals, consumable lead times, spare part availability, remote diagnostics, and the real increase path after 6 p.m.

Ask about your own side as well. Teams that footprint service history, work orders, and inspection schedules in a maintenance management system catch small faults early, which protects a capital benefit better than a longer warranty does.

7. Total Cost of Ownership, Not Sticker Price

Sticker price is the smallest number in the discussion. Service contracts, consumables, tips, software licenses, confirmation labor, training, facility changes, and energy all collect over a working life of seven to ten years, and supplies alone can eclipse the purchase price.

Sustainability data helps here more than it might emerge, because energy and waste are operational costs with an environmental label attached. My Green Lab maintains the ACT Ecolabel so that labs can make better-informed purchasing decisions, and the same figures feed a cost benchmark directly.

Conclusion

None of these seven questions require a specialist the buying team lacks. They require the patience to ask them before enthusiasm sets the budget, which is harder than it sounds when a demo has just gone beautifully.

The labs that buy well share one habit: they describe their own procedure in detail before asking a supplier to describe theirs. That order turns a sales process into an evaluation, and it lets the supplier say honestly where their platform fits.

Spend a week on the process map, then spend an afternoon on the quotes. Equipment bought that way tends to still be running, and still earning, long after the warranty expires.

FAQs

  1. How much human intervention is still needed?

Even an automated system requires staff for loading, reagent replenishment, error handling, routine maintenance, and quality checks. Map out exec touch points before buying so staffing plans stay realistic.

  1.  Should we buy refurbished or second-hand lab automation?

 Used equipment lowers up-front cost but carries risks like hidden wear, missing complaint certification, or limited service and spare parts support.

  1. What should we check on vendor codes and service agreements?

Confirm whether installation, commissioning, calibration, and user training in the first year of warranty coverage are included. Ask for clear service level response times and ongoing annual maintenance contract costs.

Related Posts

×